Friday 6 February 2015

Week 3

Wow, what a week.

It started with the retaining wall on Monday / Tuesday!


Then before we knew it, we had the pre slab work done.

Our site supervisor called this morning (Friday) and told us that the slab pour was brought forward to first thing Monday morning and our inspector would have to get re-scheduled for later today.  Luckily, it all worked out and our independent inspector came at 4:30pm (Friday).

6:30pm, I received a call from our inspector telling me that the work that was done was 'very well done' and it was a pleasant change to the usual work he's seen.  He met with our site supervisor, the slab construction team and was really impressed with their professionalism and their work.  What a great start to our build.  Here are some pics!







1 comment:

  1. Great progress. The work looks very well done. I liked the inspector's comments. Within a week you'll get a very good sense of the size of the construction.

    This is fantastic!